Security, Fire Protection Systems
New Hotel – Comprehensive Fire Protection System
- Technical challenge: Designing and implementing a fire protection system throughout the hotel facility.
- Scope of work: Planning, installation, and programming of the Hekatron fire protection system, installation of 280 automatic sensors, technical acceptance, and certification.
- Results & Benefits: The hotel meets the highest safety standards, with advanced fire hazard detection and full compliance with fire safety regulations.
2025

Electronics, Lighting, Power Supply
Bubadi
- Technical challenge: Complex cable routing and integration of modern electrical systems within a historic building structure.
- Scope of work: Installation of a medium voltage power supply system, GHV system, power distribution panels, lighting, emergency lighting system, network sockets, internet cables, and fiber optic cables. Additionally, network cabinets and cable ducts were installed.
- Results & Benefits: A modern administrative and educational center, designed to meet the highest standards of energy efficiency and technological innovation.
- Medium-voltage power supply system with two transformers • 49 power distribution panels • Over 200 km of electrical cabling • 2 km of lighting system cabling • 4,000 lighting panels • Over 1,500 network sockets • Over 160 km of internet cabling • 2,500 m of fiber optic cables • 26 network cabinets • 4 000 m of cable management systems • GHV system with a capacity of 2,500 A
2025

Lighting, Power Supply
Supermarket Network Modernization
- Technical challenge: Modernization of technical infrastructure in supermarkets with areas exceeding 10,000 m², including the comprehensive installation of lighting, power, and fire safety systems. A critical aspect was performing the work without interrupting the daily operations of the stores, while meeting the highest standards of energy efficiency and fire safety.
- Scope of work: Design and implementation of modern electrical installations, including the installation of lighting systems (main, emergency, and evacuation lighting optimized for energy efficiency), expansion and modernization of power networks, installation of LAN cabinets and telecommunication infrastructure, integration of fire safety systems, internal communication systems, and sound systems.
- Results & Benefits: Upgraded large retail stores to the highest standards of safety and operational efficiency, increased reliability of power and communication systems, reduced energy consumption and operational costs, infrastructure modernization without disrupting store activities.
- Over 30,000 meters of cable per supermarket.
2025

Power Supply, Lighting
Industrial Halls – Comprehensive Electrical Infrastructure
- Technical challenge: Installation of full electrical infrastructure in 8 industrial halls, each with an area of 800 m².
- Scope of work: Design and installation of electrical systems, lighting, and power supply systems, from medium voltage transformer to final outlets, installation of electric vehicle charging stations, and heat pump-based heating system.
- Results & Benefits: Modern, energy-efficient infrastructure fully compliant with industrial and environmental standards. The halls offer a high operational standard and flexibility for future tenants and investors.
2024

Fire Protection Systems, Security
Industrial Complex – Full Fire Protection System
- Technical challenge: Installation of a comprehensive fire protection system in interconnected industrial buildings covering a total area of over 40,000 m².
- Scope of work: Design and installation of a 24/7 fire monitoring system, two control centers for maximum safety, installation of automatic and manual sensors throughout the facility.
- Results & Benefits: The facility is fully protected from fire hazards, with advanced monitoring and rapid response capabilities, ensuring compliance with the highest safety standards.
- 18 km of cable • 1,300 automatic sensors • and 255 manual sensors
2024

Start of production of control and power cabinets.
Electronics, Lighting
Office Building Modernization
- Technical challenge: Modernization of an office building spanning over 5000 m² within an exceptionally short timeframe, while ensuring the highest technological standards.
- Scope of work: Design and installation of a high-performance, reliable internet network, and modern lighting optimized for comfort and energy efficiency.
- Results & Benefits: The building was ready for use in a record time of just 2.5 months, with a highly efficient and reliable networking and lighting infrastructure.
2024

Start of cooperation with Inotech in planning and implementing projects related to emergency lighting.
Training and expansion of our business to include medium voltage.
Fire Protection Systems, Automatic Locks, Electronics, Security
Domizil – Security Systems Modernization
- Technical challenge: Comprehensive modernization of fire protection, emergency, and access control systems in a large facility.
- Scope of work: Installation of electronic locks and automatic fire doors, setup of modern fire protection and emergency systems.
- Results & Benefits: Enhanced safety for residents and staff, full compliance with fire safety standards, and a convenient, modern access system for rooms. The implementation of advanced solutions ensures that the facility meets the highest safety and user comfort standards.
2019

Start of cooperation with Hekatron.
Fire protection systems training. From this point on, we are able to execute projects in this area.
The new generation of Famulla: Michael takes over the company and becomes Managing Director.
Lighting, Power Supply, Electronics
MSV Duisburg Stadium
- Scope of work: We covered lights programming, electricity and electronics maintenance.
2018

Security, Automatic Locks
Proprietary automatic locking technology
- Scope of work: Design and implementation of proprietary automatic locking technology to increase the level of protection for exclusive yachts.
2014

Power Supply, Security
Powering up during the 175th birthday of Graf Zeppelin
- Technical challenge: Providing power during an airport event for 70,000 people.
- Scope of work: Plan, organize and build the power supply system.
2012

Opening of the showroom at the company headquarters.
Smart Home, Electronics, Security
Smart home
- Scope of work: Sensors, cameras and multi-room technology (receiving programs on multiple devices without installing antennas).
2009

Fire Protection Systems, Lighting, Smart Home
Smart willa
- Scope of work: Intelligent control of alarms, lighting and temperature, fire protection system.
2006